A 2019 Addendum to the Final Environmental Impact Statement and Environmental Impact Report (EIS/EIR) for the Matilija Dam Ecosystem Restoration Project addressed the proposed replacement of the Santa Ana Boulevard Bridge across the Ventura River in Ventura County, California. The Addendum was prepared based on component changes and detailed design plans for the bridge replacement that were prepared in 2016 by Watershed Protection.
2019 Santa Ana Boulevard Bridge Replacement Project Addendum